The Tel Gezer Water System Expedition welcomed the second
week of the 2016 today. It was a beautiful, somewhat cool day – another great
day to dig. Due to our travels, lectures and other commitments (the need for
sleep), we weren’t able to publish an update last Thursday or post Dr. Dan
Warner’s week one video update. So, I will attempt to get you up to date with
our progress and Sarah Simon has edited and posted the week one video update
(see above).
The Water System –
Field A-B
When Thursday came to an end, the team in the water system had cleared the
width of the tunnel just below what we are calling the “bottom step.” For
several years the south half of this area has been cleared. However, we left
the northern half (actually a little more than half) as a staging area for the
bag removal process. This year removing that mass of dirt, pottery, rocks and
debris was a top priority. Since the area was sealed under the causeway of
stones laid over the pool area by Macalister in the early 1900s, the material may
be helpful in establishing the date of the system’s construction. Removing the
material necessitated a reworking of the wooden ramp used as a track for pulling
up the bags of debris. After the ramp system was removed for reconfiguration,
the team photographed and documented the whole area, because it does not appear
in Macalister’s record. After all the dig seasons, seeing the entire width of
the pool area clear of debris is thrilling. The cleaning for photography,
photography, and documentation procedures took most of the morning. After that
was complete, the ramp was reinstalled and the diggers will be filling bags at
a steady pace again Monday morning.
The Intramural
Complex – Field C
In Field C, called the intramural complex in the Dever/Seger digs (Eli’s house
in our reports last year), the work slowed considerably to carefully excavate a
sizeable vessel. Worked slowed again on Sunday when the team carefully
investigated several areas of in situ
pottery in one of the rooms. Both are very interesting finds which are still in
the interpretive stage. Very cool stuff, unfortunately, not something we can
share on the blog without further study, and possibly, the final publication of
the dig reports.
The Gate – Field D
At the gate (Field D), the team continued to search for information to link the
gate system to the rooms in Field C and to the water system. Work slowed a bit
on Thursday as some of the team members were needed to wash pottery. However,
the team did find the dividing line between Macalister’s backfill and what
appeared to be leveling layers installed by the gate’s builders. On Sunday, the
team expanded the square to encompass more of Macalister’s backfill. The effort
(which was difficult) was designed to create the necessary room to dig a probe
in search of bedrock. At some point the team seems to have broken through the
layers of Macalister’s fill to another level of undisturbed dirt. The jury is
still out on that. The probe will continue tomorrow.
Sunday Service
The day began with a devotion on the tel and because it is Sunday, after the
dig and a lecture for Dr. Warner on the Middle Bronze Age, we had another devotional/worship
time before supper. All in all, it was another wonderful day in Israel.